Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class-wp-walker.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class-wp-walker.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/query.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/query.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class-wp-date-query.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class-wp-date-query.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/post-template.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/post-template.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class.wp-styles.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class.wp-styles.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class-wp-http-streams.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class-wp-http-streams.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/rest-api/endpoints/class-wp-rest-revisions-controller.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/rest-api/endpoints/class-wp-rest-revisions-controller.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/rest-api/endpoints/class-wp-rest-taxonomies-controller.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/rest-api/endpoints/class-wp-rest-taxonomies-controller.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class-wp-block-parser.php on line 1

Notice: Uninitialized string offset: 0 in /home/o1pkef9p4hs9/public_html/texas/wp-includes/class-wp-block-parser.php on line 1
Electrical Instumentation - Texas Oil Fields

Certified

ISO 45001:2018

Certified

ISO 14001:2015

Certified

ISO 9001:2015

Certified

ASME U -STAMP & R-Stamp

Leading Provider

Of Industrial Solutions
  • Al Mulla Tower, Al nahda, Sharjah, Unites Arab Emirates
  • +971 6 530 4901

Certified

ISO 45001:2018

Certified

ISO 14001:2015

Certified

ISO 9001:2015

Certified

ASME U -STAMP & R-Stamp

Leading Provider

Of Industrial Solutions

Electrical Instumentation

ELECTRICAL

  • Reference Standards
  • Design Calculation
  • Engineering drawings
  • Conformity Analysis with Authority Rules
  • Conformity Analysis with Civil Drawings
  • Conformity Analysis with mechanical drawings
  • Quantity Survey
  • Preparation of BOQ
  • Preparation of LV Shop Drawings
  • Submission for Local Authority Approvals through contractor/Consultants

Electrical Scope of consultancy

  • Point of Supply After Transformer
  • Generator selection, installation, synchronizing, distribution
  • Low Voltage Panels
  • Power factor Correction
  • Sub Distribution
  • Final Distribution
  • Motor Control Panels with DOL Starters, Soft Starters, VFD’s
  • LV Switchgear and Control Components
  • Junction Boxes
  • Isolators
  • Push Button stations
  • Electric Motors
  • Cable and cable trays
  • Lugs and Glands
  • Light Fittings, Switches and Sockets
  • Lighting Installation Fixtures
  • Earthing Systems
  • Equipotential Bonding Systems
  • Lightning Protection systems
  • Electrical test Equipments
  • General Electrical Principles
  • Electrical Safety regulations

INSTRUMENTATION
1. Preparation of instrument index list as per P&ID diagram.

  • Study for the various instrumentation component requirement as per the P&ID, like PT, TT, radar, flow metering, pressure regulation etc.
  • Preparation of the detailed list of equipment with operational and design parameter range.

2. Preparation of specifications and data sheet for instruments.
3. Selection of radar tank gauging system.

  • Study of various available technology for tank gauging
  • Sizing and selection of the gauging system.
  • Selection of the communication of the system with TAS system
  • Providing temperature compensation.
  • Selection of the temperature averaging instrument.
  • Providing density compensation
  • Selection of suitable density compensation instrument.
  • Selection of suitable HMI and display

4. Instrumentation hookup wiring diagram.

  • Preparation of the Single line diagram.
  • Preparation of the data sheet for the cables.

5. Instrument Cable layout, junction box and cable termination drawings.

  • Preparation of the Junction box specification

6. Loop diagram and UPS distribution diagram

Top