1. Development of process flow diagram and P&ID diagram.
- Development of the operational philosophy with the end user.
- Development of the process flow diagram.
- Safety operational study (HAZOP).
- Development of the control logic.
- Development of P&ID.
2. Design and preparation of drawings of in plant piping.
- Development of the piping plan.
- Development of the piping isometrics
- Development of the Piping section.
- Pipe support details.
- Development of the piping section.
3. Design and preparation of drawings Storage Tanks.
- Tank Design Calculations
- Tank Design drawings
- Nozzle orientation drawings
4. Pump sizing Calculation for
Tanker Loading/Offloading
- Selection of the pump type.
- Preparation of the data sheet.
Stripping
- Selection of the pump type.
- Preparation of the data sheet.
5. Hydraulic calculation for piping
- Calculation of the linear pressure losses.
- Pipe components pressure losses.
- Sizing of the pipes and fittings.
6. Preparation of piping specification.
- Pipe material.
- Pipe fittings.
- Selection of the valves.
- Plate Materials
7. Preparation of BOQ for pipe, Storage Tanks, pumps and related items.
- Preparation of the Bill of material of the pipes as per the isometric drawings.
- Preparation of the Bill of material for the pipe fittings as per the isometric’s drawings.
- Preparation of Bill of Materials for storage tank as per tank design drawings.